Lanscaping on Parkway Completed
Posted on May 10th, 2011
We hope everyone has noticed all the beautification work completed in May.
Projects included:
1) Oak tree lighting extended to the stop
light
2) New flower beds on the 2nd island
3) Shrubs planted on the hillside at the golf
cart crossing
4) River rocks replacing the mulch under
the RR bridge
5) 12 new decorative stop sign poles
installed bring the total to 22
These projects were selected based on feedback from the resident survey conducted earlier this year.